top of page

First Invitation to Bid on Foxconn Construction Work Released by M+W | Gilbane

Companies are invited to submit lump sum proposals for soil testing, erosion control, mass excavation and storm water work related to Phase One of construction.

A pre-bid conference will be held today, April 10 from 3 – 4:30 p.m. at the SC Johnson iMET Center (2320 Renaissance Blvd) in Sturtevant. Non-disclosure agreements must be signed prior to attendance at this meeting.

All bids are due to M+W | Gilbane by 5:00 p.m. on Monday, April 16. The invitation to bid can be found here.

Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page