top of page

Invitations to Bid on Work Associated with the Foxconn Project


The invitation to bid for Bid Release 3C - Electrical Substation has been revised to align with the anticipated scope and design of the power substation building. As a result, there have been slight modifications to the scope of work packages.

If your firm has already submitted to the bid notification for this release, no action is required on your part.

To stay updated on bid opportunities as they become available, sign up to receive notifications from Wisconn Valley News.

Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page