Foxconn Construction: Additional Bid Packages Released

September 18, 2019

Foxconn Technology Company recently released an additional bid package seeking contractors to build out the interior of its manufacturing facility . A pre-bid meeting will be held on Thursday, September 19 at Gateway Technical College's Racine Campus (901 Pershing Drive, Racine), and responses are due on October 14.

 

Work outlined in the bid includes:

  • Carpentry

  • Doors, frames and hardware

  • Structural studs, interior framing and drywall

  • Resinous flooring and coatings

  • Soft and hard flooring systems

  • Painting and wall coverings

  • Exterior building signs

 

Information about current and former bid packages is available on WisconnValley.wi.gov .

Share on Facebook
Share on Twitter
Please reload

Featured Posts

Less Than One Year Later: Work to Begin on Foxconn Site

April 26, 2018

1/1
Please reload

Recent Posts
Please reload

Archive
Please reload

Search By Tags
Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square