Status Update – August 2020

August 20, 2020

Foxconn’s Industrial Construction Work in Area 1

WisconnValley Science & Technology Park

 

 

 

Mount Pleasant, WI – Work on remaining sitewide activities is projected to complete as scheduled

 

Fab:

  • Has received a Certificate of Occupancy

  • Final Phase 0 preparations are completing

  • Associated landscaping and paving will be completed soon

  • Code required work in the Phase 1 spaces has been designed and will begin soon

PSS:

  • Commissioning is complete

  • Permanent Power to PSS is established

Fii Projects Update

 

Smart Manufacturing Center (“SMC”):

  • Interior painting underway

  • Continuing drywall throughout

  • Continuing MEP rough-in

  • Starting finishes (flooring and ceilings) on Mezzanine level

  • Continuing site concrete

  • Prepping for paving north parking lot

High Performance Computing Data Center (“HPCDC”):

  • Completed erecting half of steel; continuing steel erection and assembly

  • Equator ring to be set 8/18 

  • Continuing lower level MEP rough-in

Businesses interested in applying for competitive bids packages with Mortenson for Foxconn’s other facilities such as the Smart Manufacturing Center (SMC) and High-Performance Computing Data Center (HPCDC) are asked to visit wisconnvalley.wi.gov for upcoming opportunities and to register at https://bit.ly/2k9Qn5V.

Students, recent college graduates, job-seekers and veterans interested in pursuing careers in fields such as high-performance computing, smart manufacturing, industrial big data, cloud computing, smart display and industrial artificial intelligence are invited to visit foxconnjobs.us to learn more.

 

Share on Facebook
Share on Twitter
Please reload

Featured Posts

Less Than One Year Later: Work to Begin on Foxconn Site

April 26, 2018

1/1
Please reload

Recent Posts
Please reload

Archive
Please reload

Search By Tags
Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square